Enterprise

One policy. Every module. Every fab.

Multi-fab IDMs and foundries standardise on Waferira for the governance as much as the control: one autonomy policy with per-fab override, one IP-isolated audit trail, a fleet-managed fab edge, and process, device and yield models that stay private to each site.

Land $2M to $20M ACVFleet-managed fab edgePer-fab private models

run_7b2e9c · agent graph · module M2 · scenario 10 nodes · 1 approval gate
01 · orchestrator ingest.lot ✓ SUCCEEDED 02 · fabtwin twin.simulate ✓ SUCCEEDED 03 · litho_overlay litho.correctables ✓ SUCCEEDED 04 · etch_depo etch.uniformity ✓ SUCCEEDED 05 · cmp_implant cmp.removal ✓ SUCCEEDED 06 · defect_inspect inspect.classify ✓ SUCCEEDED 07 · metrology_vm vm.score ✓ SUCCEEDED 08 · orchestrator approve.human ◆ APPROVAL 09 · yield_dispatch dispatch.route ✓ SUCCEEDED 10 · quality_conf lot.release ✓ SUCCEEDED

Illustrative scenario: Module M2 · 300 mm · metal-1 · lot L-48213, one lot through metal-1, one approval gate

Enterprise features

What the Enterprise tier adds

Items marked planned follow the 6 to 12 month roadmap.

Governance

Group autonomy policy

One policy model for the group with per-fab override and approval chains. Recipe windows, limits and tool-state checks reviewed and versioned like code.

Identity

SSO, SCIM and parameter-level RBAC

Named approvers, role-based access down to the recipe parameter. Planned for the 6 to 12 month release.

Fleet

Fab-edge fleet management

Model versions promoted by module with canary rollout and automatic fallback across every fab. On-prem control plane for IP-sensitive sites.

Models

Custom process, device and yield models

Per-fab models built on the fab's own recipes, devices and outcomes and kept private to that tenant.

Benchmarking

Cross-fab benchmarks

Yield, excursions, cycle time and virtual-metrology accuracy compared across fabs without moving recipes or designs across tenant boundaries. Data-network tiers are planned.

Support

Dedicated engineer, SLAs

A dedicated deployment engineer, quarterly model review per fab and SLA terms set per agreement.

Deployment

Where it runs

The fab edge is always local and IP-isolated. The control plane can be cloud, on-prem or unreachable.

Deployment options
OptionFab edgeControl planeFor
Cloud control planeGPU nodes at the tool, inside the fabWaferira cloud, per-tenant isolationFabs whose security review allows it; training stays per tenant
On-prem control planeGPU nodes at the tool, inside the fabIn the fab's own data centreIP-sensitive fabs and strict security reviews
Edge-only degradationTools stay on their own controllers and qualified recipesUnreachableWhat happens on any control-plane loss
Enterprise

Standardise autonomy across the group

One policy model, one audit trail, one benchmark across every module in every fab, with the process, device and yield models kept private to each site.

Talk to us Enterprise details

  • SSO and role-based access down to the recipe parameter, planned for the 6 to 12 month release
  • Group-wide autonomy policy with per-fab override and approval chains
  • Cross-fab benchmarking on yield, excursions, cycle time and virtual-metrology accuracy without moving recipes across tenants
  • On-prem control plane and fab-edge deployment for IP-sensitive fabs
  • Edge autonomy that survives control-plane loss by leaving each tool on its own controller and qualified recipe
  • Dedicated deployment engineer and quarterly model review per fab
Run timeline · scenario

One scenario run, step by step

Every Waferira run is an ordered, inspectable sequence. This is run_7b2e9c on Module M2 · 300 mm · metal-1 · lot L-48213. Scenario completes in 10 steps with one approval gate. Overlay and CD predicted inside spec, one reticle-repeater signature caught and held for review, dispatch re-optimised, lot released with full genealogy.

run_7b2e9c Module M2 · 300 mm · metal-1 · lot L-48213 illustrative scenario SUCCEEDED
  1. 01 ingest.lot SUCCEEDED 0.7 s

    Fab Orchestrator · Pulled lot L-48213 from fab MES: 25 wafers, 300 mm, metal-1 layer, route, reticle, overlay and CD spec and the standing cycle-time target. Locked the target envelope for the run.

  2. 02 twin.simulate SUCCEEDED 38 s

    Fab Twin · Simulated 64 candidate correctable, recipe and dispatch sets on the as-run fab twin and ranked them on predicted overlay residual, CD uniformity, excursion risk and cycle time.

  3. 03 litho.correctables SUCCEEDED 1 m 20 s

    Litho-and-Overlay · Per-field overlay correctables and a focus-dose trim written to scanner SCN-07 over SECS/GEM after the previous lot's residual trended toward the control limit. Predicted overlay residual back inside spec.

  4. 04 etch.uniformity SUCCEEDED 58 s

    Etch-and-Depo · Chamber B on etcher ETCH-12 showed an edge-fast uniformity drift in FDC. Pressure and RF trims written within the qualified recipe window; predicted CD uniformity recovered.

  5. 05 cmp.removal SUCCEEDED 46 s

    CMP-and-Implant · Downforce and platen-speed trim on CMP-03 against the virtual removal-rate estimate to hold post-CMP thickness and dishing inside the window.

  6. 06 inspect.classify SUCCEEDED continuous

    Defect-and-Inspect · Inline optical, e-beam review and SEM imagery fused at the tool edge. 1,412 events classified, most dispositioned nuisance; one reticle-repeater signature on three dies flagged for review.

  7. 07 vm.score SUCCEEDED 2.1 s

    Metrology-and-Virtual · Virtual metrology scored every wafer at post-etch and post-CMP from tool-sensor and FDC signatures. Two wafers routed to physical metrology on predicted variance; the rest sampled at plan.

  8. 08 approve.human APPROVAL 1 m 04 s

    Fab Orchestrator · The reticle-repeater signature called for a reticle inspection hold and a recipe move outside the qualified window. Held for the module process engineer and approved at 03:14:27.

  9. 09 dispatch.route SUCCEEDED 4.3 s

    Yield-and-Dispatch · Dispatch re-optimised across 1,840 lots in WIP under reticle, chamber and qualification constraints. The lot routed to the qualified chamber with the shortest predicted queue; AMHS move issued to the stocker.

  10. 10 lot.release SUCCEEDED 1 m 05 s

    Quality-and-Conformance · Lot L-48213 moved on: genealogy written (recipe moves, correctables, FDC signatures, VM scores, defect map, approvals) and checked against the layer spec.

Guardrails

An agent that can move a recipe needs a leash

Waferira writes to production tools over SECS/GEM. Every capability is scoped to a qualified recipe window, every write is policy-checked against tool state, and every action is written to an append-only, IP-isolated audit log the fab owns.

  • Recipe bounds. Each agent writes only inside the qualified recipe window for that tool, with explicit per-parameter limits.
  • Policy and tool-state checks before every write. Autonomy level, tool state, qualification, interlocks and shift are evaluated before a recipe moves.
  • Human-in-the-loop gates. Holds, out-of-window moves and lot release wait for a named approver, with OCAP linkage on every excursion.
  • Immutable, IP-isolated audit log. Append-only and exportable. Every action records source signals, retrieved procedures with citations, predicted impact, allowed range, rollback condition, approver and lot scope.
  • Rollback. Declared rollback conditions return a recipe to its previous qualified version; loss of the edge node leaves the tool on its own controller and recipe.
  • Tenant and IP isolation. Recipes, device designs, defect libraries and process memory never cross a customer boundary. Inference and feature storage stay at the fab edge; an on-prem control plane is available for IP-sensitive fabs.

Compliance posture

Compliance and certification status
ItemScopeStatus
SOC 2 Type I and fab-security reviewControl plane QUEUED Planned, first 6 months
SOC 2 Type IIControl plane QUEUED Planned, 6 to 12 months
SSO and RBACConsole and approvals QUEUED Planned, 6 to 12 months
IP-isolation and security assurance packageFab security and IT and OT review QUEUED Planned, 6 to 12 months
SEMI-standards-cited reasoningRecipes, integration specs, OCAPs RUNNING In the design, every answer cites its source
Per-tenant IP isolationData, models, memory RUNNING In the design from day one
On-prem and fab-edge deploymentIP-sensitive fabs RUNNING Design option

Read the security overview

Autonomy

Four levels, set per agent and per tool

A fab does not go from manual APC to unattended control in one step. Waferira makes the level explicit, auditable and reversible at any time. The first release runs shadow mode, then assist mode, then graduated autonomy for low-risk APC, defect and metrology loops.

Autonomy levels and the human role at each
LevelWhat the agent doesWhat the human doesWhere it sits in a pilot
L1 · AdvisoryRecommends recipe moves, dispositions and dispatch, with citationsEnters every change manuallyShadow mode, first on the design-partner cell
L2 · SupervisedProposes a recipe write or hold; it executes on approvalApproves each move in the review consoleAssist mode, where accuracy and ROI are proven
L3 · BoundedWrites inside the qualified recipe window, tool-state checks and OCAP linkageApproves holds, out-of-window moves and lot releaseGraduated autonomy for low-risk APC, defect and metrology loops
L4 · Qualified loopsRuns a qualified loop without prompting, inside its envelopeSets the envelope; reviews the shift recordPlanned; reserved for loops the fab has qualified
Integrations

It speaks SECS/GEM, not cloud

Waferira reads and writes through the systems already in the fab. No rip and replace, no parallel historian, no new HMI to learn. Vendor names are examples of systems found in front-end fabs; connector availability is confirmed per site.

Tool integration

SECS/GEM on scanners, etchers, deposition, CMP, implanters, furnaces and wet benches

Recipe reads and bounded recipe writes

APC and run-to-run

Advanced and run-to-run process control systems (Applied Materials APF and APC, PDF Solutions, in-house IDM APC)

Model state, correctables, control limits

Defect inspection

Inline optical, e-beam and SEM inspection and review tools (KLA, Applied Materials, Hitachi High-Tech, Onto Innovation class systems)

Images, defect maps, ADC classes

Metrology

Overlay, CD, film and OCD metrology (KLA, Onto Innovation, Nova class systems)

Sampled measurements that ground virtual metrology

FDC and tool sensors

Fault-detection and tool-sensor streams per chamber

Per-wafer signatures for virtual metrology and prognostics

Yield management

Yield and defect analytics (PDF Solutions Exensio, Synopsys, Siemens Camline, INFICON class systems)

Yield, bin and genealogy context

MES and scheduling

Fab MES and schedulers (Applied SmartFactory, Siemens Camstar, Critical Manufacturing, INFICON FPS class systems)

Lots, routes, WIP, dispatch lists

AMHS

Stockers, vehicles and FOUP handling (Daifuku class AMHS)

Carrier moves and handling exceptions

See all integrations

FAQ

Straight answers

The questions fab directors and process engineers ask in the first meeting.

Yes, over SECS/GEM, but only inside the qualified recipe window for that tool, with per-parameter limits and tool-state checks, and only at the autonomy level your fab has set. Level 1 is advisory: Waferira recommends and an engineer enters everything. Design partners start there, in shadow mode.

Get started

Standardise the group

Start with one process module or tool fleet and one measurable baseline. A paid, IP-isolated pilot on defect classification, virtual-metrology-driven overlay and CD control or uniformity APC shows the number before you commit further.