01
ingest.lot
✓ SUCCEEDED
0.7 s
Fab Orchestrator · Pulled lot L-48213 from fab MES: 25 wafers, 300 mm, metal-1 layer, route, reticle, overlay and CD spec and the standing cycle-time target. Locked the target envelope for the run.
-
02
twin.simulate
✓ SUCCEEDED
38 s
Fab Twin · Simulated 64 candidate correctable, recipe and dispatch sets on the as-run fab twin and ranked them on predicted overlay residual, CD uniformity, excursion risk and cycle time.
-
03
litho.correctables
✓ SUCCEEDED
1 m 20 s
Litho-and-Overlay · Per-field overlay correctables and a focus-dose trim written to scanner SCN-07 over SECS/GEM after the previous lot's residual trended toward the control limit. Predicted overlay residual back inside spec.
-
04
etch.uniformity
✓ SUCCEEDED
58 s
Etch-and-Depo · Chamber B on etcher ETCH-12 showed an edge-fast uniformity drift in FDC. Pressure and RF trims written within the qualified recipe window; predicted CD uniformity recovered.
-
05
cmp.removal
✓ SUCCEEDED
46 s
CMP-and-Implant · Downforce and platen-speed trim on CMP-03 against the virtual removal-rate estimate to hold post-CMP thickness and dishing inside the window.
-
06
inspect.classify
✓ SUCCEEDED
continuous
Defect-and-Inspect · Inline optical, e-beam review and SEM imagery fused at the tool edge. 1,412 events classified, most dispositioned nuisance; one reticle-repeater signature on three dies flagged for review.
-
07
vm.score
✓ SUCCEEDED
2.1 s
Metrology-and-Virtual · Virtual metrology scored every wafer at post-etch and post-CMP from tool-sensor and FDC signatures. Two wafers routed to physical metrology on predicted variance; the rest sampled at plan.
-
08
approve.human
◆ APPROVAL
1 m 04 s
Fab Orchestrator · The reticle-repeater signature called for a reticle inspection hold and a recipe move outside the qualified window. Held for the module process engineer and approved at 03:14:27.
-
09
dispatch.route
✓ SUCCEEDED
4.3 s
Yield-and-Dispatch · Dispatch re-optimised across 1,840 lots in WIP under reticle, chamber and qualification constraints. The lot routed to the qualified chamber with the shortest predicted queue; AMHS move issued to the stocker.
-
10
lot.release
✓ SUCCEEDED
1 m 05 s
Quality-and-Conformance · Lot L-48213 moved on: genealogy written (recipe moves, correctables, FDC signatures, VM scores, defect map, approvals) and checked against the layer spec.